Publicación: Apoyo técnico en la supervisión de la ejecución de obras en el mejoramiento de los accesos viales y la realización de proyectos internos en el frigorífico La Fazenda del km 88 Puerto Gaitán Meta
Portada
Citas bibliográficas
Código QR
Director
Autor corporativo
Recolector de datos
Otros/Desconocido
Director audiovisual
Editor/Compilador
Editores
Tipo de Material
Fecha
Cita bibliográfica
Título de serie/ reporte/ volumen/ colección
Es Parte de
Resumen
The following report aims to present the work carried out in the social, business and solidarity practice in the company IES Ltda. In the project of improvement of road access and implementation of internal projects of La Fazenda, which describes the practical practices that are carried out performed at the technical service, the hours are from 7:00 a.m. to 12:00 p.m. and from 1:00 p.m. to 5 p.m. from October 08, 2018 to December 1, 2018; the work that was carried out during the internship was the great learning in the stabilization of the internal roads of the industrial park La Fazenda because the project consisted in supervision in the following activities. 1. Excavation on the road or terrain 2. Exploitation of the mine of the material for the sub base and the base. 3. Mixed with the stabilizing product. 4. Transport of the mixed material to the final site. 5. Extended in conformation and compaction of the material, maintaining optimum humidity. The tasks to be carried out according to the project activities were as follows; Control of transport material, Completion of work courtesy, Supervision of sand field tests for verification of compaction, Review of partial minutes, Project supervision reports.