Publicación: Auxiliar de apoyo técnico en la optimización de la red de acueducto y alcantarillado de la calle 13 entre carrera 7 y 9 en la comuna 3 de la ciudad de Neiva
Portada
Citas bibliográficas
Código QR
Autores
Director
Autor corporativo
Recolector de datos
Otros/Desconocido
Director audiovisual
Editor/Compilador
Filiación Institucional
Tipo de Material
Fecha
Cita bibliográfica
Título de serie/ reporte/ volumen/ colección
Es Parte de
Resumen
This document will reflect the activities carried out as a technical support assistant to the work residence both outside and inside the work, in the project for the optimization of the aqueduct and sewage network of Calle 13 between Carrera 7 and 9 in commune 3 of the city of Neiva, carried out by the C&R consortium in the city of Neiva - Huila. The studies and designs of the aqueduct and sewage network were carried out under the parameters of current regulations that apply for this purpose, such as the RAS, NTC, NSR10, including previous studies, which as a result showed the viability of the construction of these networks under the construction contract 106 of 2021. With the approval of the construction supervisor by the CEIBAS public companies of Neiva ESP who approves the activities carried out, verifies compliance with the obligations of the construction contract and is the one who approves the changes that occur. The purpose of the technical support assistant in carrying out civil works such as aqueducts and sewers is to support the execution of the work by managing, controlling, reviewing and supervising the construction processes in accordance with the established procedures. by the construction company for which he works. Within the main functions of a technical support assistant to the work residence, they are to carry out the control in the execution of the activities of the work, ensuring that the weekly schedules are met. For this, a strict and exhaustive monitoring of the construction processes, materials and equipment to be used must be carried out. This control is carried out through the preparation of a weekly log, control of quantity reports, quality of materials, monthly work reports which have the purpose of verifying construction processes and budget control. Being a fundamental part of civil works projects, these activities need to be carried out by qualified personnel and therein lies the importance of carrying out this social, business or solidarity practice in the project to optimize the aqueduct and sewage network carried out by the C&R consortium.