Title: Auxiliar de apoyo técnico en la optimización de la red de acueducto y alcantarillado de la calle 13 entre carrera 7 y 9 en la comuna 3 de la ciudad de Neiva
Author: Calderón Obando, Diego Mauricio
Email autor: diego.calderonob@campusucc.edu.co
Issue Date: 20-Jan-2022
Advisor / Validator: Rojas Serrano, Sergio Israel
Keywords: Optimización de la red
Red de alcantarillado
Red de acueducto
Resume: En este documento se verán reflejadas las actividades realizadas como auxiliar de apoyo técnico a la residencia de obra tanto fuera como dentro de la obra, en el proyecto de la optimización de la red de acueducto y alcantarillado de la calle 13 entre carrera 7 y 9 en la comuna 3 de la ciudad de Neiva, realizada por el consorcio C&R en la ciudad de Neiva - Huila. Los estudios y diseños de la red de acueducto y alcantarillado se realizaron bajo parámetros de normas vigentes que aplican para este fin como son las RAS, NTC, NSR10, incluyendo estudios previos, los cuales como resultado arrojaron la viabilidad de las construcciones de estas redes bajo el contrato de obra 106 de 2021. Contando con la aprobación del supervisor de obra por parte de las CEIBAS empresas públicas de Neiva E.S.P quien da el visto bueno a las actividades realizadas, verifica el cumplimiento de las obligaciones del contrato de obra y es quien aprobara las modificaciones que se presenten. La finalidad del auxiliar de apoyo técnico en la realización de obras civiles como lo son los acueductos y alcantarillados es la de apoyar en la ejecución de la obra realizando la gestión, el control, revisión y supervisión de los procesos constructivos en conformidad con los procedimientos establecidos por la empresa constructora para la cual trabaja. Dentro de las funciones principales de un auxiliar de apoyo técnico a la residencia de obra, son las de realizar el control en la ejecución de las actividades de la obra, asegurándose que se cumplan los cronogramas semanales. Para ello, se ha de realizar un seguimiento estricto y exhaustivo de los procesos de construcción, materiales y equipos a utilizar. Este control es realizado a través de elaboración de una bitácora semanal, control de las memorias de cantidades, calidad de los materiales, informes de obra mensuales los cuales tienen como finalidad la verificación de los procesos constructivos y control del presupuesto. Al ser parte fundamental de los proyectos de obras civiles, estas actividades requieren ser realizadas por personal idóneo y ahí radica la importancia de realizar esta práctica social, empresarial o solidaria en el proyecto de optimización de la red de acueducto y alcantarillado que realizara el consorcio C&R.
Abstract: This document will reflect the activities carried out as a technical support assistant to the work residence both outside and inside the work, in the project for the optimization of the aqueduct and sewage network of Calle 13 between Carrera 7 and 9 in commune 3 of the city of Neiva, carried out by the C&R consortium in the city of Neiva - Huila. The studies and designs of the aqueduct and sewage network were carried out under the parameters of current regulations that apply for this purpose, such as the RAS, NTC, NSR10, including previous studies, which as a result showed the viability of the construction of these networks under the construction contract 106 of 2021. With the approval of the construction supervisor by the CEIBAS public companies of Neiva ESP who approves the activities carried out, verifies compliance with the obligations of the construction contract and is the one who approves the changes that occur. The purpose of the technical support assistant in carrying out civil works such as aqueducts and sewers is to support the execution of the work by managing, controlling, reviewing and supervising the construction processes in accordance with the established procedures. by the construction company for which he works. Within the main functions of a technical support assistant to the work residence, they are to carry out the control in the execution of the activities of the work, ensuring that the weekly schedules are met. For this, a strict and exhaustive monitoring of the construction processes, materials and equipment to be used must be carried out. This control is carried out through the preparation of a weekly log, control of quantity reports, quality of materials, monthly work reports which have the purpose of verifying construction processes and budget control. Being a fundamental part of civil works projects, these activities need to be carried out by qualified personnel and therein lies the importance of carrying out this social, business or solidarity practice in the project to optimize the aqueduct and sewage network carried out by the C&R consortium.
Table Of Contents: 1. Introducción -- 2. Requerimiento de la organización -- 3. Plan de acción -- 4. Cronograma de actividades -- 5. Actividades realizadas -- 6. Logros y lecciones aprendidas -- 7. Limitaciones, conclusiones y recomendaciones -- 8. Acta de conformidad de la organización
Program: Ingeniería Civil
Headquarters: Neiva
Publisher: Universidad Cooperativa de Colombia, Facultad de Ingenierías, Ingeniería Civil, Neiva
metadata.dc.type: Trabajos de grado - Pregrado
Citation: Calderón Obando, Diego Mauricio. (2021). Auxiliar de apoyo técnico en la optimización de la red de acueducto y alcantarillado de la calle 13 entre carrera 7 y 9 en la comuna 3 de la ciudad de Neiva [Tesis de pregrado, Universidad Cooperativa de Colombia]. Repositorio Institucional UCC. http://hdl.handle.net/20.500.12494/43340
Appears in Collections:Ingeniería Civil

Files in This Item:
File Description SizeFormat 
2022_Auxiliar_Apoyo_Tecnico.pdfTrabajo de grado2.31 MBAdobe PDFView/Open
2022_Auxiliar_Apoyo_Tecnico_LicenciaUso.pdf
  Restricted Access
Licencia de Uso219.23 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.