Publicación: Seguimiento a la interventoría técnica realizada durante el desarrollo de la práctica profesional.
Portada
Citas bibliográficas
Código QR
Autores
Director
Autor corporativo
Recolector de datos
Otros/Desconocido
Director audiovisual
Editor/Compilador
Filiación Institucional
Tipo de Material
Fecha
Cita bibliográfica
Título de serie/ reporte/ volumen/ colección
Es Parte de
Resumen
it was carried out in the construction of the first stage of the fairgrounds and exhibitions of the city of Neiva, performing the position of engineering assistant in the supervisory team, in the period between september thirty (30), 2013 and on january nineteenth (19), 2014, fulfilling the sixteen weeks of internship offered in the professional practice proposals, the intern performed the functions of follow-up and accompaniment of the audit, serving as support staff both to the resident architect of audit José Hollmer quintero parra, as well as the same legal representative of the fair consortium and the company sismecon sas. At the time that the practice begins, the work is in the black work stage as it is developing structure construction activities and at the time of completion of the professional practice the work is in the development of activities of manufacture and installation of roof structure, continuing the work in the black work stage.