Title: Auxiliar de ingeniería en el desarrollo del contrato 1342 del 2019 celebrado entre el departamento del huila y el consorcio malecom neiva
Author: Salazar Claros, María José
Email autor: maria.salazarcl@campusucc.edu.co
Issue Date: 9-Jun-2021
Advisor / Validator: Aparicio Rojas, William
Keywords: Desarrollo de contrato
Consorcio Malecom
Departamento del Huila
Resume: El principal papel que cumple como auxiliar de ingenieria, en las contrataciones de obras civiles, es el velar por la calidad y correcta ejecución de la misma. El desarrollo de esta práctica se basa en la rehabilitación del malecón Neiva, la cual es de carácter importante ya que esto beneficiara a la ciudad, el objeto de este contrato es “REHABILITACIÓN DE LA INFRAESTRUCTURA FÍSICA DEL MALECÓN DEL RIO MAGDALENA DEL MUNICIPIO DE NEIVA HUILA”, donde se implantará cicloruta, remodelación de la plazoleta de comidas, locales de artesanos y por último se construirá una cancha sintética. Este proyecto hará que los visitantes y habitantes de la ciudad de Neiva, disfruten de este bello centro histórico y sea uno de los sitios turísticos más visitados. Como resultado, para la realización de cualquier obra civil la calidad y seguimiento de control, son aspectos importantes de los cuales depende gran parte de la factibilidad y éxito de la obra. La anticipación de los imprevistos, que suceden muy a menudo, unido a los posibles ajustes de diseño que puedan ser necesarios, forma un conjunto de aspectos que deben estar contenidos en el presupuesto. El acompañamiento en el lugar de la obra durante su ejecución, sumado al control del personal y maquinaria durante el avance hasta la culminación del proyecto, propician un desarrollo de la obra más seguro, evitando inconsistencias o sobrecostos que acarreen adiciones presupuestales y problemas económicos o legales para las distintas partes del contrato junto con el incumplimiento. El contratista, desempeña una labor importante en cualquier obra a ejecutar ya que está a cargo de todos los procesos constructivos donde se va inspeccionando cada una de las actividades que se realizan a diario, donde se toman decisiones importantes para la buena ejecución del proyecto, el contratista ira de la mano siempre con interventoría pues esta es la que aprobara toda las decisiones que se tomen con el contratista, con base a esto el contratista de obra tiene la responsabilidad de la planeación del proyecto hasta su liquidación
Abstract: The main role that it fulfills as an engineering assistant, in the hiring of civil works, is to ensure the quality and correct execution of the same. The The development of this practice is based on the rehabilitation of the Neiva boardwalk, which is of an important nature since this will benefit the city, the object of this contract is “REHABILITATION OF THE PHYSICAL INFRASTRUCTURE OF THE MALECÓN DEL RIO MAGDALENA OF THE MUNICIPALITY OF NEIVA HUILA ”, where will implant cycle route, remodeling of the food court, premises of craftsmen and finally a synthetic court will be built. This project will make the visitors and inhabitants of the city of Neiva, enjoy this beautiful center historical and is one of the most visited tourist sites. As a result, for the performance of any civil works, the quality and monitoring of control, are important aspects on which a large part of the feasibility and success of the work. The anticipation of unforeseen events, which happen very often, coupled with possible design adjustments that may be necessary, it forms a set of aspects that must be contained in the budget. The accompaniment at the work site during its execution, added to the control of personnel and machinery during the progress until the completion of the project, promote a safer development of the work, avoiding inconsistencies or cost overruns that lead to budget additions and economic problems or legal for the different parts of the contract together with the breach. The contractor performs an important work in any work to be executed already who is in charge of all the construction processes where it is inspected each of the activities carried out daily, where decisions are made important for the successful execution of the project, the contractor will go hand in hand always with auditing since this is the one that will approve all the decisions that are take with the contractor, based on this the work contractor has the responsibility for the planning of the project until its liquidation
Table Of Contents: 1. Introducción -- 2. Planteamiento del problema -- 3. Justificación -- 4. Objetivos -- 5. Objetivo general -- 6. Objetivos específicos -- 7. Marco referencial -- 8. Marco conceptual -- 9. Marco legal -- 10. Descripción del proyecto -- 11. Información general -- 12. Localización -- 13. Cronograma de actividades -- 14. Actividades realizadas -- 15. Semana 01 "15 de octubre 21 de octubre" -- 16. Semana 02 "22 de octubre 28 de octubre" -- 17. Semana 03 "29 de octubre 09 de noviembre" -- 18. Semana 04 "10 de noviembre 16 de noviembre" -- 19. Semana 05 "17 de noviembre 23 de noviembre" -- 20. Semana 06 "24 de noviembre 30 de noviembre" -- 21. Semana 07 "01 de diciembre 07 de diciembre" -- 22. Semana 08 "08 de diciembre 15 de diciembre" -- 23. Semana 09 "16 de diciembre 22 de diciembre" -- 24. Semana 10 "04 de enero 10 de enero" -- 25. Semana 11 "11 de enero 17 de enero" -- 26. Semana 12 "18 de enero 24 de enero" -- 27. Semana 13 "25 de enero 31 de enero" -- 28. Semana 14 "01 febrero 07 de febrero" -- 29. Semana 15 "08 febrero 14 de febrero" -- 30. Semana 16 "15 febrero 21 de febrero" -- 31. Conclusiones -- 32. Bibliografía -- 33. Anexos
Program: Ingeniería Civil
Headquarters: Neiva
Type: Trabajos de grado - Pregrado
Citation: Salazar Claros, M (2021). Auxiliar de ingeniería en el desarrollo del contrato 1342 del 2019 celebrado entre el departamento del Huila y el consorcio Malecom Neiva [Trabajo de grado. universidad Cooperativa de Colombia], Repositorio institucional UCC. http://hdl.handle.net/20.500.12494/34751
Appears in Collections:Ingeniería Civil

Files in This Item:
File Description SizeFormat 
2021_Auxiliar_Ingenieria_Desarrollo_LicenciaUso.pdfLicencia de Uso195.63 kBAdobe PDFView/Open Request a copy
2021_Auxiliar_Ingenieria_Desarrollo.pdfTrabajo de grado723.5 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.