Publicación: Interventoría al proyecto “Bodega Agrocosur” en la etapa de diseños y estudios
Portada
Citas bibliográficas
Código QR
Director
Autor corporativo
Recolector de datos
Otros/Desconocido
Director audiovisual
Editor/Compilador
Editores
Tipo de Material
Fecha
Cita bibliográfica
Título de serie/ reporte/ volumen/ colección
Es Parte de
Resumen
In all civil engineering work it is of great importance to have a technical administrative audit preliminary to the design of the plans and technical studies of the project to be carried out, in order to guarantee that the certain conditions are met and that it can be built in safe and efficient way. In this project, an audit was carried out focused on studies and designs of the "WINERY AGROCOSUR" project, where it was verified that it has the corresponding minutes and licenses, as well as that it complies with the respective standards: COLOMBIAN REGULATION OF EARTH RESISTANT CONSTRUCTIONS (NSR-10 ) for structural and architectural plans, TECHNICAL REGULATION OF ELECTRICAL INSTALLATIONS (RETIE) for electrical plans, COLOMBIAN CODE OF HYDRAULIC AND SANITARY INSTALLATIONS (NTC-1500) for hydrosanitary plans. In said audit, it was possible to identify some shortcomings and minimal breaches in the designs of the plans, however it can be established that this has more than 90% of roads to start the execution of the project and it could be stated that if the company QUIMOL LTDA , build the project correcting the aforementioned observations, it would be guaranteeing quality and safety once the project is delivered.