Publicación: Acompañamiento y seguimiento técnico a los estudios, diseño y rehabilitación de las intersecciones de la avenida 40, carrera 40, carrera 43 con la calle 15, avenida 40 entre calle 11 y calle 7 (costado occidental) y la calle 11 entre la avenida 40 y carrera 40 en el municipio de Villavicencio, que realiza la secretaria de Planeación de Villavicencio Meta
Portada
Citas bibliográficas
Código QR
Autores
Director
Autor corporativo
Recolector de datos
Otros/Desconocido
Director audiovisual
Editor/Compilador
Editores
Tipo de Material
Fecha
Cita bibliográfica
Título de serie/ reporte/ volumen/ colección
Es Parte de
Resumen
The shortcomings present in the road network of the municipality of Villavicencio are evident, due to the projection of this municipality, until 2016 it did not have the economic and population growth upon reaching it. Starting in 2016, the main objective is based on making Villavicencio a strategic capital, renewing and improving aspects of mobility / transport, sanitation and drainage, economic competitiveness, among others. "Villavicencio will be the plain dawn in the construction of life opportunities" (Arboleda, L) is the proposal by the president of the financial development board, which shows us the Villavicencio action plan. Continuing with the model of renovation in the city, the project “Studies, design and rehabilitation of the intersections of Avenida 40, Carrera 40, Carrera 43 with Calle 15, Avenida 40 between Calle 11 and Calle 7 (side occidental) and 11th street between 40th avenue and 40th race in the municipality of Villavicencio ", the aim is to fulfill the objective of improving infrastructure for active and sustainable transportation; being a support as a civil engineering student in supervision by of the planning secretariat in the following sections: Carrera 39 (change of pipeline and improvement of the road structure from 15-20 street) Calle 15, 19 and calle 20 (from Carrera 39 to Avenida 40) Avenida 40 (from the registry office to the gazebo) The practice was carried out at times carried out by the work from 8:00 am to 12:00 pm and 1:00 pm to 5:00 pm and other night hours, from September 9, 2019 to October 21, 2019 Fulfilling 320 hours of work carried out in field inspections. The planning secretariat as supervisor of contract No. 1595 of 2018, management, orientation and directs the guidelines established in territorial, economic, social and cultural development, monitoring of works in progress in the city.