Title: Supervisión de procesos constructivos en la obra correspondiente a la instalación de 1200 metros de tubería PVC en 10" para la optimización del distrito de 11 del Ibal S.A.E.S.P
Author: Gutierrez Carrizosa, Juan David
Email autor: juan.gutierrezc@campusucc.edu.co
Issue Date: 12-Mar-2020
Advisor / Validator: Santafe Salazar, Cesar Augusto
Keywords: procesos constructivos
optimización de la red
instalación de tubería PVC
Resume: La Universidad Cooperativa de Colombia (UCC), establece un convenio de prácticas con la empresa prestadora de servicios de acueducto y alcantarillado IBAL S.A E.S.P; cuyo objetivo es la cooperación entre dichas instituciones, para adelantar practicas y/o programas sociales como opción de modalidad de grado de los estudiantes de la UCC. La ciudad de Ibagué en los últimos años ha venido en constante crecimiento en cuanto a infraestructura debido a su crecimiento poblacional, por lo tanto se ve la necesidad de optimizar las redes de servicios públicos para mejorar la calidad en dichos servicios, más exactamente en la distribución de agua potable. Dicho esto, el estudiante (en este caso el autor) inicia un periodo de actividades con una duración de 320h para cumplir con el requisito de modalidad de grado. Durante el desarrollo de la práctica, se prestó apoyo en la supervisión de los procesos llevados a cabo para la optimización de la red de acueducto que conforma el distrito hidráulico 11 del IBAL; para ser más exactos, el tramo comprendido entre la Avenida Pedro Tafur y el conjunto residencial La Samaria, bajando vía aeropuerto Perales. En este tramo se realizó la instalación de la nueva red de acueducto de 10”, que reemplaza la tubería antigua de 8”. Se realizaron diferentes tareas que ayudaron a buen desarrollo de la obra mencionada, tales como: diligenciar la bitácora semanal con el reporte de las actividades realizadas, pedir el material necesario para los procesos respectivos, llevar registro fotográfico, pedir apoyo del personal operativo en caso de necesitarlo, guiar la excavación cumpliendo con la profundidad estimada en los diseños, informar al ingeniero jefe de la división de acueducto, sobre cualquier novedad presentada en la obra. Debido a la construcción de la doble calzada vía al aeropuerto Perales, simultáneamente con la red de acueducto, se estaban instalando las nuevas redes de servicios públicos antes de la construcción de la nueva vía, por lo tanto cada jueves se hacían comités que contaban con la presencia de entidades como: Grodco, que es la firma encargada de la construcción de la vía, Alcanos, Enertolima, IBAL, Secretaria De Infraestructura, Secretaria De Planeación, Espacio Público entre otras. Estas entidades exponían sus avances a la interventoría encargada y a todo el grupo presente, para cumplir con los cronogramas establecidos. De esta manera se hacía un trabajo en conjunto de todas las entidades, para lograr la optimización de toda la red de servicios públicos para la zona de expansión de la ciudad de Ibagué. Al finalizar el tiempo establecido para el periodo de prácticas, se cumplió con el objetivo, el cual era la instalación de la tubería de 10” con sus respectivas acometidas, la cual actualmente se encuentra en funcionamiento.
Abstract: The Universidad Cooperativa de Colombia (UCC) establishes an internship agreement with the company that provides aqueduct and sewerage services IBAL S.A E.S.P; whose objective is the cooperation between these institutions, to advance internships and / or social programs as an option for the degree modality of UCC students. The city of Ibagué in recent years has been constantly growing in terms of infrastructure due to its population growth, therefore there is a need to optimize public service networks to improve the quality of these services, more precisely in distribution of drinking water. That said, the student (in this case the author) begins a period of activities with a duration of 320h to meet the degree modality requirement.During the development of the practice, support was provided in the supervision of the processes carried out for the optimization of the aqueduct network that makes up the 11th IBAL hydraulic district; to be more exact, the section between Avenida Pedro Tafur and the residential complex La Samaria, going down via Perales airport. In this section, the new 10 ”aqueduct network was installed, which replaces the old 8” pipe. Different tasks were carried out that helped the development of the aforementioned work, such as: filling out the weekly log with the report of the activities carried out, requesting the necessary material for the respective processes, keeping a photographic record, requesting support from the operational personnel in case of need it, guide the excavation complying with the estimated depth in the designs, inform the chief engineer of the aqueduct division, about any novelty presented in the work. Due to the construction of the dual carriageway to the Perales airport, simultaneously with the aqueduct network, the new public service networks were being installed before the construction of the new highway, therefore, committees were held every Thursday that had the presence of entities such as: Grodco, which is the firm responsible for the construction of the road, Alcanos, Enertolima, IBAL, Secretary of Infrastructure, Secretary of Planning, Public Space, among others. These entities exposed their progress to the auditing in charge and to the entire group present, to comply with the established schedules. In this way, a joint work was done by all the entities to achieve the optimization of the entire network of public services for the expansion area of ​​the city of Ibagué. At the end of the time established for the training period, the objective was met, which was the installation of the 10 ”pipeline with its respective connections, which is currently in operation.
Table Of Contents: Introducción. -- 1. Planteamiento Del Problema. -- 1.1. Justificación. -- 2. Objetivos 2.1. Objetivo General. -- 2.2. Objetivos Específicos. -- 3. Marco De Referencia. -- 3.1. Marco Institucional. -- 3.1.1. Descripción de la empresa. -- 3.1.2. Misión y visión. --3.1.3. Organigrama. -- 3.2. Marco Teórico. -- 3.2.1. Redes de distribución de agua potable. -- 3.2.2. Estudios previos. -- 3.2.2.1. Concepción del proyecto. -- 3.2.2.2. Infraestructura existente. -- 3.2.2.3. Estudio de la demanda. -- 3.2.2.4. Análisis de costo mínimo. -- 3.2.2.5. Optimización de la red de distribución. -- 3.2.2.6. Distribución espacial de la demanda. -- 3.2.2.7. Aspectos generales de la zona de la red de distribución. -- 3.2.2.8. Estudios topográficos. -- 3.2.2.9. Condiciones geológicas. -- 3.2.2.10. Estudio de suelos. -- 3.2.2.11. Calidad de agua. -- 3.2.2.12. Factibilidad de ampliación. -- 3.2.2.13. Interferencia con otras redes y corrientes eléctricas. -- 3.2.2.14. Áreas por abastecer. -- 3.2.2.15. Amenaza sísmica. -- 3.2.3. Ejecución de las obras. -- 3.2.3.1. Replanteo y trazado del proyecto. -- 3.2.3.2. Demoliciones. -- 3.2.3.3. Transporte y almacenamiento de materiales. -- 3.2.3.4. Maquinaria y equipo de trabajo. -- 3.2.3.5. Excavación. -- 3.2.3.6. Instalación de tubería. -- 3.2.3.7. Accesorios. -- 3.2.3.8. Acometidas. -- 3.3. Marco Geográfico. -- 4. Desarrollo De La Práctica Profesional. -- 4.1 Materiales Y Equipos Utilizados. -- 4.2 Descripción De Las Actividades. -- 4.2.1. Transporte De La Tubería. -- 4.2.2. Excavaciones. -- 4.2.3. Instalación De Tubería. -- 4.2.4. Instalación De Accesorios Y Derivaciones. -- 4.3. Problemas Encontrados En La Obra. -- 4.4. Aportes Del Pasante A La Empresa. -- 5. Conclusiones. -- 6. Recomendaciones. – Bibliografía. – Anexos.
Program: Ingeniería Civil
Headquarters: Ibagué
Type: Trabajos de grado - Pregrado
Citation: Gutierrez Carrizosa, J.D. (2018). Supervisión de Procesos Constructivos en la Obra Correspondiente a la Instalación a la Instalación de 1200 metros de Tubería PVC 10", para la Optimización del Distrito de 11 del Ibal S.A.E.S.P. (Tesis de Pregrado). Recuperado de: http://hdl.handle.net/20.500.12494/17156
Appears in Collections:Ingeniería Civil

Files in This Item:
File Description SizeFormat 
supervision_procesos_obra.pdftrabajo de grado17.87 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.