Publicación: Plan de Gestion y Administracion de la Construcción del alcantarillado y planta de tratamiento en el municipio de Purificación Tolima
Portada
Citas bibliográficas
Código QR
Director
Autor corporativo
Recolector de datos
Otros/Desconocido
Director audiovisual
Editor/Compilador
Editores
Tipo de Material
Fecha
Cita bibliográfica
Título de serie/ reporte/ volumen/ colección
Es Parte de
Resumen
The present work of a deepening seminar consists in the construction of a 743 ml sewer system consisting of fourteen inspection wells; and a sewage treatment plant consisting of a filter area, a sand trap (specifically and prefabricated) and a grease trap; for the Purification community in the department of Tolima. The quality plan is carried out considering ISO 9001: 20015 standards, quality management systems; ISO 14001, environmental management systems; ISO 45001: 2018 - OHSAS 18001, ISO 10005: 2005, occupational safety and health management systems. For the calculation of the amounts of work, the design plans of the sewerage and treatment plant of the Purification municipality were used. With the help of the AutoCAD work software, the necessary procedures were carried out to find the volumes, areas, distances, weights and supplies for the preparation of the budget. For the list of inputs, quotes from different websites of stores specialized in the construction of civil works were compared, seeking a balance between quality and price. Once the costs of the materials have been obtained, the format for the unit price analysis (APU) was made in which the direct costs of the inputs are related to other factors such as labor, equipment and material transport. Reference prices for labor, equipment and machinery were taken from the website of the National Road Institute. (INVIAS, 2018)