Title: Implementación de la metodología BIM(Building Information Modeling) al proyecto de construcción "Clínica de Pequeños Animales Bloque Salado de la Universidad Cooperativa de Colombia Sede Ibagué - Espinal"
Author: Guluma Garzon, Edwar Fabian
Aguilar Gil, Juan Carlos
Benitrez Osorio, Julian Andres
Email autor: juan.aguilargi@campusucc.edu.co
julian.benitez@campusucc.edu.co
edwar.guluma@campusucc.edu.co
Issue Date: 16-Jan-2020
Advisor / Validator: Gomez Lozano, Alberto
Santafe Salazar, Cesar Agusto
Keywords: Building Information Modeling
Clínica de pequeños animales
Universidad Cooperativa de Colombia
Ibagué - Espinal
Resume: En el área de la construcción y la edificación aún es muy común encontrar proyectos que avanzan con procesos tradicionales que, aunque son efectivos no logran ser eficaces y eficientes, por lo general presentan demoras, sobrecostos y en algunos casos hasta el abandono del proyecto. En este trabajo se demuestra que al implementar tecnología en los procesos constructivos que van desde la planeación del proyecto hasta el final del ciclo de vida del mismo, es posible tener total control de estos con el fin de reducir tiempos, costos y aumentar la calidad en cada proceso constructivo del proyecto. Para lograr tal objetivo se utilizó la metodología BIM (Building Information Modeling) para modelar la Clínica de pequeños animales Bloque salado de la Universidad Cooperativa de Colombia sede Ibagué – Espinal. En el desarrollo de esta metodología se recopilo información sobre esta edificación, sin embargo no fue posible obtener información sobre la estructura y las instalaciones, este vacío de información es muy común encontrarlo en proyectos que se realizaron con el método tradicional, para resolver este problema se propuso de manera técnica los diseños para las instalaciones y la estructura de la edificación, luego con la ayuda de la herramienta Revit y la interoperabilidad que este permite, integrar todas las especialidades en un solo modelo y generar la posibilidad de observar y solucionar los posibles errores que en el futuro iban a generar inconsistencias en el desarrollo normal del proyecto.
Abstract: In the area of the construction and the edification is still common to find projects that are executed with traditional procedures that, even though, they are effective, they don’t achieve to be efficacious and efficient. Those projects usually face delays, over costs and in some cases abandonment of the project. This work shows that to implement technology in the constructive process that goes from the planning of the Project until the end of the lifecycle of it. It’s possible to have control over the phases in order to reduce time, costs and to increase the quality in each one. In order to achieve that goal, the BIM (Building Information Modeling) was used to model the “Small Animals’ Clinic, Block salado of the Cooperative University of Colombia, Ibagué – Espinal” In the development of this methodology several info about this edification was collected, however, it was not possible to get info of the structure and the facilities, and this empty space of info is very common to find it in the traditional method, to solve this issue, it was proposed in a technical way the designs for the facilities and the structure of the edification, then, with the help of the tool Revit and the interpretability and this gives, to integrate all the specialties in one single model and to generate the possibility to observe and solving the possible issues that in the future would present inconsistences in the normal development of the project.
Table Of Contents: Resumen. -- Introducción. -- 1. Descripción Del Problema. -- 2. Justificación. -- 3. Objetivos. -- 3.1. Objetivo General. -- 3.2. Objetivos Específicos. -- 4. Marco Teórico. -- 4.1. Estado Del Arte. -- 4.1.1. ¿Qué Es Bim?. -- 4.1.2. ¿Cuándo Nació?. -- 4.1.3. ¿Por Qué Nació?. -- 4.2. Antecedentes. -- 4.3. Normativa Relacionada. -- 4.4. Caso De Estudio. -- 5. Metodología. -- 5.1. Clasificación Y Recopilación De Información. -- 5.2. Diseño Estructural. -- 5.3. Diseño Arquitectónico. -- 5.4. Diseño De Cielo Razo Y Cubierta. -- 5.5. Instalaciones. -- 5.5.1. Instalaciones Hidrosanitarias. -- 5.5.2. Instalaciones Eléctricas. -- 5.6. Cantidades De Obra. -- 6. Resultados. -- 7. Conclusiones. -- 8. Recomendaciones. -- Bibliografía. -- Anexos.
Program: Ingeniería Civil
Headquarters: Ibagué
Type: Trabajos de grado - Pregrado
Citation: Guluma Garzon, E. F., Aguilar Gil, J. C. y Benitez Osorio, J. A..(2019) Implementación de la metodología BIM(Building Information Modeling) al proyecto de construcción "Clínica de Pequeños Animales Bloque Salado de la Universidad Cooperativa de Colombia Sede Ibagué - Espinal (Tesis de grado pregrado). Recuperado de: http://hdl.handle.net/20.500.12494/16267
Appears in Collections:Ingeniería Civil

Files in This Item:
File Description SizeFormat 
2019_ Implementacion_Metodologia_Bim.pdfTrabajo de grado4.2 MBAdobe PDFView/Open