Title: Acompañamiento en los procesos de formulación y ejecución de la empresa Tag Perforaciones en proyectos de anclajes pasivos y activos en el municipio de Ibagué
Author: Hurtado Pérez, Luis Gabriel
Email autor: luis.hurtadop@campusucc.edu.co
Issue Date: 13-Sep-2019
Advisor / Validator: Cardona García, Oscar Hernán
Osorio Dávila, Ambrosio
Keywords: Procesos
Anclajes
Proyectos
Activos
Pasivos
Resume: A causa de la inestabilidad de los taludes naturales y la necesidad de modificar artificialmente muchos de ellos, surge la necesidad de estabilizarlos para así ejecutar obras urbanísticas, viales entre otras es allí donde los ingenieros civiles incursionan en muchos de los métodos utilizados para controlar y estabilizar los taludes dentro de estas actividades la empresa TAG Perforaciones desarrolla sus contratos de obra específicamente en métodos conocidos como anclajes activos o pasivos. Dentro de la práctica profesional, realizada en la empresa TAG Perforaciones de Ibagué, se realizaron actividades como: acompañamiento técnico en campo, en los diversos procesos constructivos directos de la perforación y elaboración de los anclajes activos, nómina de personal activo, informe de avance y control de materiales en obra. La importancia de un ingeniero o en este caso un pasante dentro de una obra de anclaje es vital debido a sus conocimientos geotécnicos y civiles en general para solucionar inconvenientes presentados en campo como la relación agua cemento muchas veces desconocida para los operarios de las máquinas de perforación, lo cual resulta en un anclaje con menos capacidad. Llevar un control de materiales de calidad y un buen sistema de requisición de los mismos fueron tareas implementadas en esta práctica empresarial, fue una de las mejoras aportadas para TAG Perforaciones con esto se dio un mejor control de la obra sin interrupciones por falta de materiales que a me nudo ocurría debido a que no existía un control de los materiales utilizados y necesarios en obra. El tensionamiento de un anclaje es la actividad final de la construcción de un anclaje activo y es en esa actividad donde se evalúa su buena construcción al momento de su alcance máximo de tensionamiento que deberá ser el del diseño, fue importante llevar un control del diseño en cada anclaje construido para que al momento de su tensionamiento pudiera cumplir con su capacidad diseñada.
Abstract: Because of the instability of the natural slopes and the need to artificially modify many of them, there is a need to stabilize them in order to execute urban works, roads among others is where civil engineers enter many of the methods used to control and stabilize the slopes within these activities the company TAG Perforaciones develops its construction contracts specifically in methods known as active or passive anchors. Within the professional practice, carried out in the company TAG Perforaciones de Ibagué, activities were carried out such as: technical support in the field, in the various direct construction processes of drilling and preparation of active anchors, payroll of active personnel, progress report and control of materials on site. The importance of an engineer or in this case an intern within an anchoring work is vital due to his geotechnical and civil knowledge in general to solve problems presented in the field such as the cement water ratio often unknown to drilling machine operators , which results in an anchor with less capacity. Keeping track of quality materials and a good requisition system were tasks implemented in this business practice, it was one of the improvements made for TAG Perforations with this there was a better control of the work without interruptions due to lack of materials that It often occurred because there was no control of the materials used and necessary on site. The tension of an anchor is the final activity of the construction of an active anchor and it is in that activity where its good construction is evaluated at the time of its maximum tension range that should be that of the design, it was important to keep a check of the design in each anchor built so that at the time of tensioning it could fulfill its designed capacity.
Table Of Contents: Introducción. -- 1. Descripción del problema. -- 1.1 Justificación del problema. -- Objetivos. -- 2.1 Objetivo General. -- 2.2 Objetivos específicos. -- 3. Marco de referencia. -- 3.1 Marco institucional. -- 3.1.1 TAG Perforaciones. -- 3.1.1.1 Misión. -- 3.1.1.2 Visión. -- 3.1.1.3 Funciones. -- 3.1.1.4 Dependencia donde se realizó la pasantía. -- 3.1.2 Universidad cooperativa de Colombia. -- 3.1.2.1 Misión. -- 3.1.2.2 Visión. -- 3.1.2.3 Estructura Organizacional. -- 3.2 Marco teórico. -- 3.2.1 Métodos de Ruptura. -- 3.2.2 Condiciones de falla en suelos. -- 3.2.3 Partes de un Anclaje. -- 3.2.4 Anclajes. -- 3.2.5 Proceso constructivo de anclajes Activos. -- 3.2.6 Aspectos a tener en cuenta para supervisar la parte técnica de una Obra. -- 3.2.7 Elemento de Contención. -- 3.2.8 Tipos de anclajes Pos-tensados. -- 3.3 Marco histórico. -- 3.3.1 Reseña histórica de la estabilidad de los suelos. -- 4. Desarrollo de la practica profesional. -- 4.1 Descripción de las actividades. -- 4.1.1 Acompañamiento técnico en campo. -- 4.1.1.1. Contrato 001 del consorcio “EL MOLINO”. -- 4.1.1.2 Contrato SH-1010197-16 Proyecto “Morada Pinaos”. -- 4.1.2. Proceso de perforación. -- 4.1.3 Proceso de llenado e Inyectado. -- 4.1.4 Proceso de tensionamiento. -- 4.1.2 Informe de avance de obra. -- 4.1.2.1 Informe de tensionamiento. -- 4.1.2.2 Informe de elongación de anclaje. -- 4.1.3 Nomina de personal. -- 5. Conclusiones. -- 6. Recomendaciones. -- 7. Bibliografía. -- 8. Anexos.
Program: Ingeniería Civil
Headquarters: Ibagué
Type: Trabajos de grado - Pregrado
Citation: Hurtado Pérez, L. G..(2019) Acompañamiento en los procesos de formulación y ejecución de la empresa Tag Perforaciones en proyectos de anclajes pasivos y activos en el municipio de Ibagué (Tesis de pregado). Universidad Cooperativa de Colombia. Ibagué. Recuperado de:http://hdl.handle.net/20.500.12494/13899
Appears in Collections:Ingeniería Civil

Files in This Item:
File Description SizeFormat 
2017_Acompanamiento_procesos_formulacion.pdfTrabajo de grado5.46 MBAdobe PDFView/Open
2017_Acompanamiento_procesos_formulacion-FormatoPublicacionWeb.pdfPublicación Web575.13 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.